Monday, July 30, 2012

Diversion Trench for the City of Cedarsburg, WI

Crest Precast Concrete engineered and manufactured a 56 feet long special water diversion trench for the City of Cedarsburg, WI. Casting was 48,000 lbs and used to divert waste water from one tank to the next. Unit was placed without disrupting the water treatment process.

 www.crestprecasstconcrete.com